- 25-04-24Periodic maintenance cooling system BIT-2BCD
- 22-04-24Periodic maintenance cooling system BIT-2A
- 18-04-24Maintenance diesel tanks power generators BIT-2A
- 15-04-24Periodic maintenance cooling system BIT-1
- 11-04-24Maintenance computair units BIT-2A
- 09-04-24Maintenance computair units BIT-2C
- 08-04-24Maintenance computair units BIT-2B
- 05-04-24Firewall Maintenance
- 04-04-24Periodic maintenance fire detection and suppression systems BIT-2A and BIT-2BCD
- 04-04-24Maintenance diesel tanks power generators BIT-2A
Fiber maintenance BIT-1 - Telecity 2
31-05-2017 00:00:00
- 31-05-2017 08:00:00
Wednesday May 31st from 0.00h to 8.00h our supplier will perform scheduled maintenance on our fiber connection between BIT-1 in Ede and Telecity 2 in Amsterdam. During this maintenance the connection will be down for a several hours. Traffic will be rerouted via other paths, which can cause short disruptions in network connections. Customers with a wavelength between these locations will notice disruption of their connections during the entire duration of the maintenance window.