- 25-04-24Periodic maintenance cooling system BIT-2BCD
- 22-04-24Periodic maintenance cooling system BIT-2A
- 18-04-24Maintenance diesel tanks power generators BIT-2A
- 15-04-24Periodic maintenance cooling system BIT-1
- 11-04-24Maintenance computair units BIT-2A
- 09-04-24Maintenance computair units BIT-2C
- 08-04-24Maintenance computair units BIT-2B
- 05-04-24Firewall Maintenance
- 04-04-24Periodic maintenance fire detection and suppression systems BIT-2A and BIT-2BCD
- 04-04-24Maintenance diesel tanks power generators BIT-2A
Maintenance cooling system BIT-1
22-06-2018 08:00:00
- 22-06-2018 17:30:00
Affected services:
- customers with equipement in BIT-1
Expected Impact:
- slight increase in temperature
Summary:
On Friday 22nd of June we will perform maintenance on the cooling system of BIT-1 between 8.00h and 17.30h.
During this maintenance there is a chance of a slight inc rease in temperature. We will take precautions to reduce this increase and aim to keep the time the cooling system is shut down to an absolute minimum.
This maintenance will be supervised by BIT engineers who will monitor the temperature in the data center closely.
- customers with equipement in BIT-1
Expected Impact:
- slight increase in temperature
Summary:
On Friday 22nd of June we will perform maintenance on the cooling system of BIT-1 between 8.00h and 17.30h.
During this maintenance there is a chance of a slight inc rease in temperature. We will take precautions to reduce this increase and aim to keep the time the cooling system is shut down to an absolute minimum.
This maintenance will be supervised by BIT engineers who will monitor the temperature in the data center closely.