- 25-04-24Periodic maintenance cooling system BIT-2BCD
- 22-04-24Periodic maintenance cooling system BIT-2A
- 18-04-24Maintenance diesel tanks power generators BIT-2A
- 15-04-24Periodic maintenance cooling system BIT-1
- 11-04-24Maintenance computair units BIT-2A
- 09-04-24Maintenance computair units BIT-2C
- 08-04-24Maintenance computair units BIT-2B
- 05-04-24Firewall Maintenance
- 04-04-24Periodic maintenance fire detection and suppression systems BIT-2A and BIT-2BCD
- 04-04-24Maintenance diesel tanks power generators BIT-2A
Emergency maintenance UPS-set BIT-2C A-Feed
21-06-2018 00:00:00
- 21-06-2018 07:00:00
Affected services:
On Thursday, June 21th between 0.00 and 7.00h our UPS set supplier will be performing maintenance on our UPS set in BIT-2C A-Feed. During this maintenance the UPS set will be put into bypass. The UPS set for the B-feed will remain operational.
Details:
Following up on the power outage on June 12th, we will preventatively replace all batteries of UPS set of the A-Feed. During this maintenance the UPS set will be put in bypass mode. We do not expect any disruption in the power supply, but it is possible that the ATS in your rack (if applicable) will switch to the other power feed. If you have received warnings from BIT that your total power consumption is close to the limit, we recommend that you take action before this maintenance starts.
If you have any questions regarding this maintenance, please contact our Customer Care Department on +31 (0)318 648 688 or via support@bit.nl.
- A-feed BIT-2C
- none
On Thursday, June 21th between 0.00 and 7.00h our UPS set supplier will be performing maintenance on our UPS set in BIT-2C A-Feed. During this maintenance the UPS set will be put into bypass. The UPS set for the B-feed will remain operational.
Details:
Following up on the power outage on June 12th, we will preventatively replace all batteries of UPS set of the A-Feed. During this maintenance the UPS set will be put in bypass mode. We do not expect any disruption in the power supply, but it is possible that the ATS in your rack (if applicable) will switch to the other power feed. If you have received warnings from BIT that your total power consumption is close to the limit, we recommend that you take action before this maintenance starts.
If you have any questions regarding this maintenance, please contact our Customer Care Department on +31 (0)318 648 688 or via support@bit.nl.