- 25-04-24Periodic maintenance cooling system BIT-2BCD
- 22-04-24Periodic maintenance cooling system BIT-2A
- 18-04-24Maintenance diesel tanks power generators BIT-2A
- 15-04-24Periodic maintenance cooling system BIT-1
- 11-04-24Maintenance computair units BIT-2A
- 09-04-24Maintenance computair units BIT-2C
- 08-04-24Maintenance computair units BIT-2B
- 05-04-24Firewall Maintenance
- 04-04-24Periodic maintenance fire detection and suppression systems BIT-2A and BIT-2BCD
- 04-04-24Maintenance diesel tanks power generators BIT-2A
Black building emergency power test BIT-1
04-06-2019 05:00:00
- 04-06-2019 06:10:00
Urgency: Planned
Affected services: Customers with equipment in BIT-1
Expected impact: None
Customer intervention required: No
Reference number: 162545
Contact: +31 (0)318 648 688, support@bit.nl
Summary:
On Tuesday June 4th between 5:00 hrs and 7:00 hrs we will perform a black building emergency power test.
Details:
During this maintencance we will switch off our power supply for building BIT-1 entirely for 60 minutes, in orderto test our emergency power systems . During this test, engineers from BIT will be monitoring the situation on multiple locations and will, if the need should arise, intervene. We will perform a battery discharge test in the days leading up to the black building test. This discharge test will be performed on both feeds seperately.
Update placed at 04/06/2019, 06:10
The black building emergency power test was successfull. We have worked on generator power from 05:07 until 06:09 in BIT-1.
Affected services: Customers with equipment in BIT-1
Expected impact: None
Customer intervention required: No
Reference number: 162545
Contact: +31 (0)318 648 688, support@bit.nl
Summary:
On Tuesday June 4th between 5:00 hrs and 7:00 hrs we will perform a black building emergency power test.
Details:
During this maintencance we will switch off our power supply for building BIT-1 entirely for 60 minutes, in orderto test our emergency power systems . During this test, engineers from BIT will be monitoring the situation on multiple locations and will, if the need should arise, intervene. We will perform a battery discharge test in the days leading up to the black building test. This discharge test will be performed on both feeds seperately.
Update placed at 04/06/2019, 06:10
The black building emergency power test was successfull. We have worked on generator power from 05:07 until 06:09 in BIT-1.