- 15-04-24Periodic maintenance cooling system BIT-1
- 11-04-24Maintenance computair units BIT-2A
- 09-04-24Maintenance computair units BIT-2C
- 08-04-24Maintenance computair units BIT-2B
- 05-04-24Firewall Maintenance
- 04-04-24Periodic maintenance fire detection and suppression systems BIT-2A and BIT-2BCD
- 04-04-24Maintenance diesel tanks power generators BIT-2A
- 04-04-24Maintenance diesel tank power generator BIT-1
- 27-03-24Maintenance temperature sensor BIT-2A
- 21-03-24Maintenance power generator BIT-1
VLAN migration
18-09-2019 00:00:00
- 18-09-2019 04:00:00
Urgency: Planned
Affected services:
- Email
- Shared webhosting
- Portal
- Interne BIT servers
- Backup
Expected impact:
- A brief interruption of the affected services.
Customer intervention required: No
Reference number: 164367
Summary:
BIT will be performing a network migration within the demilitarized zone (DMZ).
Details:
A large part of the DMZ has already been migrated to the new firewall cluster. Except for some VLAN's because these could not be moved during the previous migration. A single VLAN will be migrated in this maintenance window. A disruption of a few seconds is expected for the aforementioned services during this migration.
Several BIT engineers will be present during this maintenance.
Affected services:
- Shared webhosting
- Portal
- Interne BIT servers
- Backup
Expected impact:
- A brief interruption of the affected services.
Customer intervention required: No
Reference number: 164367
Summary:
BIT will be performing a network migration within the demilitarized zone (DMZ).
Details:
A large part of the DMZ has already been migrated to the new firewall cluster. Except for some VLAN's because these could not be moved during the previous migration. A single VLAN will be migrated in this maintenance window. A disruption of a few seconds is expected for the aforementioned services during this migration.
Several BIT engineers will be present during this maintenance.