- 25-04-24Periodic maintenance cooling system BIT-2BCD
- 22-04-24Periodic maintenance cooling system BIT-2A
- 18-04-24Maintenance diesel tanks power generators BIT-2A
- 15-04-24Periodic maintenance cooling system BIT-1
- 11-04-24Maintenance computair units BIT-2A
- 09-04-24Maintenance computair units BIT-2C
- 08-04-24Maintenance computair units BIT-2B
- 05-04-24Firewall Maintenance
- 04-04-24Periodic maintenance fire detection and suppression systems BIT-2A and BIT-2BCD
- 04-04-24Maintenance diesel tanks power generators BIT-2A
Black building emergency power test BIT-2
14-12-2021 05:00:00
- 14-12-2021 07:00:00
Urgency: Planned
Affected services: Colocation BIT-2A and BIT-2BCD
Impact: Main power grid BIT-2A and BIT-2BCD
Customer intervention required: No
Reference number: 176242
Summary:
On Tuesday, December 14th between 5:00 hrs and 7:00 hrs we will perform a black building emergency power test at BIT-2.
Details:
During this maintenance, we will switch off the main power supply for the entire location BIT-2 for 60 minutes to test our emergency power systems. During this test, engineers of BIT will be monitoring the situation on multiple locations and will, if the need should arise, intervene. We will perform a deep battery discharge test in the days leading up to the black building test. This is done because we will also run on battery before running on power generators. This discharge test will be performed on both feeds separately.
Affected services: Colocation BIT-2A and BIT-2BCD
Impact: Main power grid BIT-2A and BIT-2BCD
Customer intervention required: No
Reference number: 176242
Summary:
On Tuesday, December 14th between 5:00 hrs and 7:00 hrs we will perform a black building emergency power test at BIT-2.
Details:
During this maintenance, we will switch off the main power supply for the entire location BIT-2 for 60 minutes to test our emergency power systems. During this test, engineers of BIT will be monitoring the situation on multiple locations and will, if the need should arise, intervene. We will perform a deep battery discharge test in the days leading up to the black building test. This is done because we will also run on battery before running on power generators. This discharge test will be performed on both feeds separately.