Black building emergency power test BIT-2

Back
Status: Maintenance

Black building emergency power test BIT-2

Urgency: Planned
Affected services: Colocation BIT-2A and BIT-2BCD
Expected impact: Main power grid BIT-2A and BIT-2BCD
Customer intervention required: No
Reference number: 201848

Summary:

On Tuesday, December 9th between 5:00 hrs and 7:00 hrs we will perform a black building emergency power test at BIT-2.

Details:

During this maintenance, we will switch off the main power supply for the entire location BIT-2 for 60 minutes to test our emergency power systems. During this test, BIT engineers will be present at all required locations to monitor the situation, so they can intervene if necessary. In the days leading up to the black building test, we will perform a deep battery discharge test. This is done because we will also run on battery before running on generators. This discharge test will be performed on both feeds separately.


Update placed at 09/12/2025, 07:15
This maintenance had implications regarding feed A in BIT-2B, but was completed at 06:55 hrs. If you have any questions regarding this maintenance, please contact the Customer Care department by phone on +31 (0)318 648 688 or by email on support@bit.nl.