Periodic maintenance cooling system BIT-1

Maintenance

Periodic maintenance cooling system BIT-1

Urgency: Planned
Affected services: Colocatie in BIT-2A
Expected impact: Slight increase in temperature
Customer intervention required: No
Reference number: 200603

Summary:

Periodic maintenance is performed on the cooling system in BIT-1.

Details:

The downflow units (responsible for blowing cold air in the data centers) will be shut down for maintenance one at a time. This may result in a slight temporary increase in temperature in specific parts of the data center. This maintenance will be supervised by BIT engineers who will monitor the temperature in the data center closely.