Periodic maintenance cooling system BIT-1
Periodic maintenance cooling system BIT-1
Urgency: Planned
Affected services: Colocatie in BIT-2A
Expected impact: Slight increase in temperature
Customer intervention required: No
Reference number: 200603
Summary:
Periodic maintenance is performed on the cooling system in BIT-1.
Details:
The downflow units (responsible for blowing cold air in the data centers) will be shut down for maintenance one at a time. This may result in a slight temporary increase in temperature in specific parts of the data center. This maintenance will be supervised by BIT engineers who will monitor the temperature in the data center closely.