Periodic maintenance power distribution BIT-2BCD

Maintenance

Periodic maintenance power distribution BIT-2BCD

Urgency: Planned
Affected services:

  • Feed A and B BIT-2B
  • Feed A and B BIT-2C
  • Feed A and B BIT-2D

Expected impact:  None
Customer intervention required: No
Reference number: 199957

Summary:

Periodic maintenance will be performed on the power distribution of BIT-2BCD.

Details:

From September 2, 2024, to September 5, 2024, between 00:00 and 07:00, periodic maintenance and a thermographic inspection will be carried out on the power distribution of BIT-2BCD. During this maintenance, all switches of the BIT-2BCD power distribution will be serviced. The UPS systems will be placed in bypass mode one by one for this purpose.

If the feed from the respective UPS system is interrupted during this maintenance, which we do not expect, the other feed will be available as normal. We strongly advise checking if all your equipment is connected to both feeds.

The entire maintenance will be supervised by BIT’s datacenter engineers.