Replacement UPS BIT-2B feed B

Back
Status: Maintenance

Replacement UPS BIT-2B feed B

Urgency: Planned
Affected services: Colocation in BIT-2B
Expected impact: Reduced emergency power supply redundancy
Customer intervention required: No
Reference number: 204285

Summary:

Reduced BIT-2B power supply redundancy during UPS replacement.

Details:

The UPS systems in BIT-2B and BIT-2C are to be replaced preventatively due to their age. During the indicated period, we will replace the UPS of feed B in BIT-2B.

During the work, the UPS for feed A will supply both the A and B feeds. The UPS of feed A has ample capacity to deliver this extra power. However, this means only one UPS will be available during this work.

On Monday 2 November between 05:00 and 07:00, feed B in BIT-2B will be switched over. Two weeks later, on 16 November, between 05:00 and 07:00, feed B will be switched back. From that moment on, the feed will be powered by the new feed B UPS and redundancy will be restored.

We do not expect any interruption during both switchovers, but the switching itself does create an increased risk.

Update placed at 31/10/2026, 14:55
Due to unforeseen circumstances on the supplier’s part, this maintenance will be postponed. It is not yet known when the maintenance will take place. As soon as this is confirmed, the maintenance will be announced again.