- 12-04-24Nieuw bij BIT: GPU hosting
- 25-03-24BIT breidt netwerkconnectiviteit uit met aansluiting op NL-ix^2
- 13-03-24No More Leaks: Samenwerken tegen cybercriminaliteit
- 03-03-24Geen verandering twee jaar na invoering sancties tegen Russische media: FOIC roept (wederom) op tot einde van ondemocratische censuur
- 29-01-24Onzichtbare upgrades
- 16-01-24BIT's Wido Potters wint Felipe Rodriquez Award voor inzet voor privacy
- 10-01-24BIT en partners zetten de koers voor een gedecentraliseerde Europese cloud met ECOFED-project
- 02-01-24Onze eigen stroom inkopen: de resultaten van 2023
- 24-11-23BIT Friday 2023
- 30-08-23A BIT of support: Hulp aan FCBU tijdens de oorlog in Oekraïne
Periodic maintenance power distribution BIT-2BCD
11-07-2019 00:00:00
- 11-07-2019 07:00:00
Urgency: Planned
Affected services:
- Feed A BIT-2B
- Feed A BIT-2C
- Feed A BIT-2D
Expected impact: None
Customer intervention required: No
Reference number: 162868
Contact: +31 (0)318 648 688, support@bit.nl
Summary:
Periodic maintenance will be carried out on the power distribution of
BIT-2BCD.
Details:
Periodic maintenance will be carried out and a thermographic inspection
will be conducted on the power distribution panel of BIT-2BCD. During
this maintenance all main power switches will be serviced, therefore the
UPS systems will be put in bypass mode one at a time.
We do not expect interruption of power to the UPS systems during this
maintenance. In the unlikely event of interruption, the remaining feed
is able to power all the systems. There will always be one feed fully
operational.
We strongly advice all customers to make sure all equipment is connected
to both power feeds.
This maintenance will be supervised by BIT engineers.
Affected services:
- Feed A BIT-2B
- Feed A BIT-2C
- Feed A BIT-2D
Expected impact: None
Customer intervention required: No
Reference number: 162868
Contact: +31 (0)318 648 688, support@bit.nl
Summary:
Periodic maintenance will be carried out on the power distribution of
BIT-2BCD.
Details:
Periodic maintenance will be carried out and a thermographic inspection
will be conducted on the power distribution panel of BIT-2BCD. During
this maintenance all main power switches will be serviced, therefore the
UPS systems will be put in bypass mode one at a time.
We do not expect interruption of power to the UPS systems during this
maintenance. In the unlikely event of interruption, the remaining feed
is able to power all the systems. There will always be one feed fully
operational.
We strongly advice all customers to make sure all equipment is connected
to both power feeds.
This maintenance will be supervised by BIT engineers.