- 31-05-24Maintenance UPS sets BIT-2B
- 30-05-24Maintenance UPS sets BIT-2D
- 29-05-24Maintenance UPS-sets BIT-2C
- 28-05-24Maintenance UPS sets BIT-1
- 22-05-24Maintenance UPS sets BIT-2A
- 16-05-24Periodic maintenance powerinfra and transformers BIT-2
- 25-04-24Periodic maintenance cooling system BIT-2BCD
- 22-04-24Periodic maintenance cooling system BIT-2A
- 18-04-24Maintenance diesel tanks power generators BIT-2A
- 15-04-24Periodic maintenance cooling system BIT-1
Maintenance computair units BIT-2A
23-03-2020 08:00:00
- 21-04-2020 17:30:00
Urgency: Planned
Affected services:
- Equipment in BIT-2A
Expected impact: Slight increase or decrease in temperature
Customer intervention required: No
Reference number: 157802
Summary:
Maintenance will be done on the computair units in BIT-2A.
Details:
The computair units (responsible for blowing cold air into the data centers) will be shut down for a revision one at a time. This may result in a slight temporary increase or decrease in temperature in specific parts of the data center.
The maintenance will take place every workday between 08:00 and 17:30 hrs
This maintenance will be supervised by BIT engineers, who will also monitor the temperature in the data center closely.
Affected services:
- Equipment in BIT-2A
Expected impact: Slight increase or decrease in temperature
Customer intervention required: No
Reference number: 157802
Summary:
Maintenance will be done on the computair units in BIT-2A.
Details:
The computair units (responsible for blowing cold air into the data centers) will be shut down for a revision one at a time. This may result in a slight temporary increase or decrease in temperature in specific parts of the data center.
The maintenance will take place every workday between 08:00 and 17:30 hrs
This maintenance will be supervised by BIT engineers, who will also monitor the temperature in the data center closely.