Periodic maintenance power distribution BIT-2BCD

Periodic maintenance power distribution BIT-2BCD

20-05-2020 00:00:00 - 20-05-2020 07:00:00

Urgency: Planned
Affected services:
- Feed B BIT-2B
- Feed B BIT-2C
- Feed B BIT-2D
Expected impact: None
Customer intervention required: No
Reference number: 167812

Summary:

Periodic maintenance will be carried out on the power distribution of BIT-2BCD.


Details:

Periodic maintenance will be carried out and a thermographic inspection will be conducted on the power distribution panel of BIT-2BCD. During this maintenance all main power switches will be serviced, therefore the UPS systems will be put in bypass mode one at a time.

We do not expect interruption of power to the UPS systems during this maintenance. In the unlikely event of interruption, the remaining feed is able to power all the systems. There will always be one feed fully operational. We strongly advice you to make sure all equipment is connected to both power feeds.

This entire maintenance will be supervised by BIT engineers.