- 24-04-24Status.bit.nl in nieuw jasje!
- 12-04-24Nieuw bij BIT: GPU hosting
- 25-03-24BIT breidt netwerkconnectiviteit uit met aansluiting op NL-ix^2
- 13-03-24No More Leaks: Samenwerken tegen cybercriminaliteit
- 03-03-24Geen verandering twee jaar na invoering sancties tegen Russische media: FOIC roept (wederom) op tot einde van ondemocratische censuur
- 29-01-24Onzichtbare upgrades
- 16-01-24BIT's Wido Potters wint Felipe Rodriquez Award voor inzet voor privacy
- 10-01-24BIT en partners zetten de koers voor een gedecentraliseerde Europese cloud met ECOFED-project
- 02-01-24Onze eigen stroom inkopen: de resultaten van 2023
- 24-11-23BIT Friday 2023
Preventive maintenance sub-distributor BIT-2B
25-09-2020 00:00:00
- 25-09-2020 07:00:00
Urgency: Planned
Time window:
- 24/09/2020 00:00 hrs - 24/09/2020 07:00 hrs
- 25/09/2020 00:00 hrs - 25/09/2020 07:00 hrs
Expected impact:
- Possible loss of power redundancy
Customer intervention required: No
Reference number: 170302
Summary:
In cooperation with our supplier we will make improvements to the electrical installation. These improvements are the result of an inspection of the fire safety of the electrical installation.
Details:
The load on the sub-distributors will be transferred to the sub-distributor for the other feed. We do not expect any disruption in the power supply of any power feed, but it is possible that the ATS in your rack (if applicable) will switch to the other power feed. In case of disruption of mains power to the UPS, this UPS has enough battery capacity to switch to generator power.
During load switching moments we will be running on generator power as a precaution. This will negate possible phase differences and the UPSs will have to be bypassed during the load switching moments.
Because various changes will be combined we can not specify when this specific change will take place.
Time window:
- 24/09/2020 00:00 hrs - 24/09/2020 07:00 hrs
- 25/09/2020 00:00 hrs - 25/09/2020 07:00 hrs
Expected impact:
- Possible loss of power redundancy
Customer intervention required: No
Reference number: 170302
Summary:
In cooperation with our supplier we will make improvements to the electrical installation. These improvements are the result of an inspection of the fire safety of the electrical installation.
Details:
The load on the sub-distributors will be transferred to the sub-distributor for the other feed. We do not expect any disruption in the power supply of any power feed, but it is possible that the ATS in your rack (if applicable) will switch to the other power feed. In case of disruption of mains power to the UPS, this UPS has enough battery capacity to switch to generator power.
During load switching moments we will be running on generator power as a precaution. This will negate possible phase differences and the UPSs will have to be bypassed during the load switching moments.
Because various changes will be combined we can not specify when this specific change will take place.