- 01-04-25BIT as a Service
- 26-03-25Internetproviders verliezen rechtszaak over blokkeren websites
- 19-02-25BIT introduceert server-side e-mailfiltering met Sieve
- 06-02-25Shared hosting wordt opgefrist
- 28-11-24ECOFED uitgeroepen tot publieksfavoriet bij Computable Awards
- 21-11-24Een goede cloud heeft een kundige dirigent nodig
- 17-10-24ECOFED wint ICT Innovatieprijs Regio Foodvalley 2024
- 01-08-24BIT geeft kaarten weg voor F1 in Zandvoort
- 24-04-24Status.bit.nl in nieuw jasje!
- 12-04-24Nieuw bij BIT: GPU hosting
Periodic maintenance cooling system BIT-2A
06-04-2021 08:00:00
- 16-04-2021 17:30:00
Urgency: Planned
Affected services:
- Colocation in BIT-2A
Expected impact: Slight increase in temperature
Customer intervention required: No
Reference number: 173118
Summary:
Periodic maintenance is performed on chillers and downflow units in BIT-2A.
Details:
The downflow units (responsible for blowing cold air in the data centers) will be shut down for maintenance one at a time. This may result in a slight temporary increase in temperature in specific parts of the data center. The chillers of BIT-2A will be shut down for maintenance one at a time as well. The remaining two chillers have sufficient capacity to cool the data center. This maintenance will be supervised by BIT engineers who will monitor the temperature in the data center closely.
The maintenance will take place every workday between 08:00 and 17:30 hrs
This maintenance will be supervised by BIT engineers.
Affected services:
- Colocation in BIT-2A
Expected impact: Slight increase in temperature
Customer intervention required: No
Reference number: 173118
Summary:
Periodic maintenance is performed on chillers and downflow units in BIT-2A.
Details:
The downflow units (responsible for blowing cold air in the data centers) will be shut down for maintenance one at a time. This may result in a slight temporary increase in temperature in specific parts of the data center. The chillers of BIT-2A will be shut down for maintenance one at a time as well. The remaining two chillers have sufficient capacity to cool the data center. This maintenance will be supervised by BIT engineers who will monitor the temperature in the data center closely.
The maintenance will take place every workday between 08:00 and 17:30 hrs
This maintenance will be supervised by BIT engineers.