- 25-03-24BIT breidt netwerkconnectiviteit uit met aansluiting op NL-ix^2
- 13-03-24No More Leaks: Samenwerken tegen cybercriminaliteit
- 03-03-24Geen verandering twee jaar na invoering sancties tegen Russische media: FOIC roept (wederom) op tot einde van ondemocratische censuur
- 29-01-24Onzichtbare upgrades
- 16-01-24BIT's Wido Potters wint Felipe Rodriquez Award voor inzet voor privacy
- 10-01-24BIT en partners zetten de koers voor een gedecentraliseerde Europese cloud met ECOFED-project
- 02-01-24Onze eigen stroom inkopen: de resultaten van 2023
- 24-11-23BIT Friday 2023
- 30-08-23A BIT of support: Hulp aan FCBU tijdens de oorlog in Oekraïne
- 13-07-23NDIX verbinding via BIT
Periodic maintenance cooling system BIT-2A
06-04-2021 08:00:00
- 16-04-2021 17:30:00
Urgency: Planned
Affected services:
- Colocation in BIT-2A
Expected impact: Slight increase in temperature
Customer intervention required: No
Reference number: 173118
Summary:
Periodic maintenance is performed on chillers and downflow units in BIT-2A.
Details:
The downflow units (responsible for blowing cold air in the data centers) will be shut down for maintenance one at a time. This may result in a slight temporary increase in temperature in specific parts of the data center. The chillers of BIT-2A will be shut down for maintenance one at a time as well. The remaining two chillers have sufficient capacity to cool the data center. This maintenance will be supervised by BIT engineers who will monitor the temperature in the data center closely.
The maintenance will take place every workday between 08:00 and 17:30 hrs
This maintenance will be supervised by BIT engineers.
Affected services:
- Colocation in BIT-2A
Expected impact: Slight increase in temperature
Customer intervention required: No
Reference number: 173118
Summary:
Periodic maintenance is performed on chillers and downflow units in BIT-2A.
Details:
The downflow units (responsible for blowing cold air in the data centers) will be shut down for maintenance one at a time. This may result in a slight temporary increase in temperature in specific parts of the data center. The chillers of BIT-2A will be shut down for maintenance one at a time as well. The remaining two chillers have sufficient capacity to cool the data center. This maintenance will be supervised by BIT engineers who will monitor the temperature in the data center closely.
The maintenance will take place every workday between 08:00 and 17:30 hrs
This maintenance will be supervised by BIT engineers.