- 31-05-24Maintenance UPS sets BIT-2B
- 30-05-24Maintenance UPS sets BIT-2D
- 29-05-24Maintenance UPS-sets BIT-2C
- 28-05-24Maintenance UPS sets BIT-1
- 22-05-24Maintenance UPS sets BIT-2A
- 16-05-24Periodic maintenance powerinfra and transformers BIT-2
- 25-04-24Periodic maintenance cooling system BIT-2BCD
- 22-04-24Periodic maintenance cooling system BIT-2A
- 18-04-24Maintenance diesel tanks power generators BIT-2A
- 15-04-24Periodic maintenance cooling system BIT-1
Periodic maintenance cooling system BIT-2A and BIT-2BC
09-05-2022 08:00:00
- 11-05-2022 17:30:00
Urgency: Planned
Affected services:
- Colocation in BIT-2A and BIT-2BC
Expected impact: Slight increase in temperature
Customer intervention required: No
Reference number: 178959 & 178960
Summary:
Periodic maintenance is performed on downflow units in BIT-2A and BIT-2BC
Details:
The downflow units (responsible for blowing cold air in the data centers) will be shut down for maintenance one at a time. This may result in a slight temporary increase in temperature in specific parts of the data center. This maintenance will be supervised by BIT engineers who will monitor the temperature in the data center closely.
The maintenance will take place every workday between 08:00 and 17:30 hrs
Affected services:
- Colocation in BIT-2A and BIT-2BC
Expected impact: Slight increase in temperature
Customer intervention required: No
Reference number: 178959 & 178960
Summary:
Periodic maintenance is performed on downflow units in BIT-2A and BIT-2BC
Details:
The downflow units (responsible for blowing cold air in the data centers) will be shut down for maintenance one at a time. This may result in a slight temporary increase in temperature in specific parts of the data center. This maintenance will be supervised by BIT engineers who will monitor the temperature in the data center closely.
The maintenance will take place every workday between 08:00 and 17:30 hrs