- 31-05-24Maintenance UPS sets BIT-2B
- 30-05-24Maintenance UPS sets BIT-2D
- 29-05-24Maintenance UPS-sets BIT-2C
- 28-05-24Maintenance UPS sets BIT-1
- 22-05-24Maintenance UPS sets BIT-2A
- 16-05-24Periodic maintenance powerinfra and transformers BIT-2
- 25-04-24Periodic maintenance cooling system BIT-2BCD
- 22-04-24Periodic maintenance cooling system BIT-2A
- 18-04-24Maintenance diesel tanks power generators BIT-2A
- 15-04-24Periodic maintenance cooling system BIT-1
Periodic maintenance on all cooling pumps of BIT-2
24-10-2022 08:00:00
- 24-10-2022 17:30:00
Urgency: Planned
Affected services:
- Colocation in BIT-2A and BIT-2BC
Expected Impact: Slight increase in temperature
Customer intervention required: No
Reference number: 181438
Summary:
Periodic maintenance on the cooling pumps in BIT-2.
Details:
On Monday the 24th of October beween 8:00 hrs and 17.30 hrs, we will perform maintenance on all cooling pumps of the cooling installation for BIT-2. The pumps will be shut down for maintenance one by one. This maintenance will be supervised by BIT engineers.
Affected services:
- Colocation in BIT-2A and BIT-2BC
Expected Impact: Slight increase in temperature
Customer intervention required: No
Reference number: 181438
Summary:
Periodic maintenance on the cooling pumps in BIT-2.
Details:
On Monday the 24th of October beween 8:00 hrs and 17.30 hrs, we will perform maintenance on all cooling pumps of the cooling installation for BIT-2. The pumps will be shut down for maintenance one by one. This maintenance will be supervised by BIT engineers.