- 01-04-25BIT as a Service
- 26-03-25Internetproviders verliezen rechtszaak over blokkeren websites
- 19-02-25BIT introduceert server-side e-mailfiltering met Sieve
- 06-02-25Shared hosting wordt opgefrist
- 28-11-24ECOFED uitgeroepen tot publieksfavoriet bij Computable Awards
- 21-11-24Een goede cloud heeft een kundige dirigent nodig
- 17-10-24ECOFED wint ICT Innovatieprijs Regio Foodvalley 2024
- 01-08-24BIT geeft kaarten weg voor F1 in Zandvoort
- 24-04-24Status.bit.nl in nieuw jasje!
- 12-04-24Nieuw bij BIT: GPU hosting
Maintenance power switches BIT-2BCD
08-12-2022 00:00:00
- 08-12-2022 07:00:00
Urgency: Planned
Affected services:
- Feed A BIT-2B
- Feed A BIT-2C
- Feed A BIT-2D
- Feed B BIT-2B
- Feed B BIT-2C
- Feed B BIT-2D
Expected impact: None
Customer intervention required: No
Reference number: 181643
Summary:
Parts are being replaced on the power switches of BIT-2BCD as a preventive measure.
Details:
Parts are being preventively replaced on the power switches of the power supply of BIT-2BCD. This is to ensure proper operation of the switches in the future.
We do not expect interruption of power to the UPS systems during this maintenance. In the unlikely event of interruption, the remaining feed is able to power all the systems. There will always be one feed fully operational. We strongly advise you to make sure all equipment is connected to both power feeds.
This entire maintenance will be supervised by BIT engineers.
Affected services:
- Feed A BIT-2B
- Feed A BIT-2C
- Feed A BIT-2D
- Feed B BIT-2B
- Feed B BIT-2C
- Feed B BIT-2D
Expected impact: None
Customer intervention required: No
Reference number: 181643
Summary:
Parts are being replaced on the power switches of BIT-2BCD as a preventive measure.
Details:
Parts are being preventively replaced on the power switches of the power supply of BIT-2BCD. This is to ensure proper operation of the switches in the future.
We do not expect interruption of power to the UPS systems during this maintenance. In the unlikely event of interruption, the remaining feed is able to power all the systems. There will always be one feed fully operational. We strongly advise you to make sure all equipment is connected to both power feeds.
This entire maintenance will be supervised by BIT engineers.