- 31-05-24Maintenance UPS sets BIT-2B
- 30-05-24Maintenance UPS sets BIT-2D
- 29-05-24Maintenance UPS-sets BIT-2C
- 28-05-24Maintenance UPS sets BIT-1
- 22-05-24Maintenance UPS sets BIT-2A
- 16-05-24Periodic maintenance powerinfra and transformers BIT-2
- 25-04-24Periodic maintenance cooling system BIT-2BCD
- 22-04-24Periodic maintenance cooling system BIT-2A
- 18-04-24Maintenance diesel tanks power generators BIT-2A
- 15-04-24Periodic maintenance cooling system BIT-1
Replacement chillers BIT-1
03-04-2023 07:00:00
- 24-04-2023 17:30:00
Urgency: Planned
Affected services:
- Colocation in BIT-1
Expected impact: Slight increase or decrease in temperature
Customer intervention required: No
Reference number: 182285
Summary:
The chillers of BIT-1 are being replaced.
Details:
The chillers of BIT-1 are being replaced, including the associated pipelines. The maintenance is expected to take about 4 weeks.
During the maintenance, data center engineers from BIT will supervise the entire process and monitor the temperature in BIT-1 to ensure that all goes as planned.
Affected services:
- Colocation in BIT-1
Expected impact: Slight increase or decrease in temperature
Customer intervention required: No
Reference number: 182285
Summary:
The chillers of BIT-1 are being replaced.
Details:
The chillers of BIT-1 are being replaced, including the associated pipelines. The maintenance is expected to take about 4 weeks.
During the maintenance, data center engineers from BIT will supervise the entire process and monitor the temperature in BIT-1 to ensure that all goes as planned.