- 23-05-25Maintenance UPS sets BIT-2B
- 22-05-25Maintenance UPS-sets BIT-2C
- 21-05-25Maintenance UPS sets BIT-2D
- 20-05-25Maintenance UPS sets BIT-1
- 12-05-25Maintenance UPS sets BIT-2A
- 22-04-25Periodic maintenance fire detection and suppression systems BIT-2A and BIT-2BCD
- 15-04-25Maintenance Microsoft SQL instances servers
- 15-04-25Maintenance virtualization platform
- 08-04-25Baseline Measurement Electrical Installation BIT-2BCD
- 08-04-25Maintenance upload.bit.nl
Periodic maintenance on all cooling pumps of BIT-2
18-10-2023 08:00:00
- 18-10-2023 17:30:00
Urgency: Planned
Affected services:
- Colocation in BIT-2A and BIT-2BC
Expected Impact: Slight increase in temperature
Customer intervention required: No
Reference number: 185048
Summary:
Periodic maintenance on the cooling pumps in BIT-2.
Details:
On Wednesday the 18th of October beween 8:00 hrs and 17.30 hrs, we will perform maintenance on all cooling pumps of the cooling installation for BIT-2. The pumps will be shut down for maintenance one by one. This maintenance will be supervised by BIT engineers.
Affected services:
- Colocation in BIT-2A and BIT-2BC
Expected Impact: Slight increase in temperature
Customer intervention required: No
Reference number: 185048
Summary:
Periodic maintenance on the cooling pumps in BIT-2.
Details:
On Wednesday the 18th of October beween 8:00 hrs and 17.30 hrs, we will perform maintenance on all cooling pumps of the cooling installation for BIT-2. The pumps will be shut down for maintenance one by one. This maintenance will be supervised by BIT engineers.