- 21-12-23Maintenance fire suppression BIT
- 13-12-23Fiber maintenance BIT-1 - Equinix AM7
- 12-12-23Black building emergency power test BIT-2
- 06-12-23Certification fire alarm and gas extinguishing system BIT-1, BIT-2A and BIT-2BCD
- 05-12-23Black building emergency power test BIT-1
- 10-11-23Maintenance fire detection and suppression systems BIT-1, BIT-2A and BIT-2BCD
- 26-10-23Maintenance management software virtualisation platform
- 24-10-23Periodic maintenance cooling system BIT-2BCD
- 23-10-23Periodic maintenance cooling system BIT-2A
- 19-10-23Emergency maintenance MySQL servers and network stats server
Periodic maintenance on all cooling pumps of BIT-2
18-10-2023 08:00:00
- 18-10-2023 17:30:00
Urgency: Planned
Affected services:
- Colocation in BIT-2A and BIT-2BC
Expected Impact: Slight increase in temperature
Customer intervention required: No
Reference number: 185048
Summary:
Periodic maintenance on the cooling pumps in BIT-2.
Details:
On Wednesday the 18th of October beween 8:00 hrs and 17.30 hrs, we will perform maintenance on all cooling pumps of the cooling installation for BIT-2. The pumps will be shut down for maintenance one by one. This maintenance will be supervised by BIT engineers.
Affected services:
- Colocation in BIT-2A and BIT-2BC
Expected Impact: Slight increase in temperature
Customer intervention required: No
Reference number: 185048
Summary:
Periodic maintenance on the cooling pumps in BIT-2.
Details:
On Wednesday the 18th of October beween 8:00 hrs and 17.30 hrs, we will perform maintenance on all cooling pumps of the cooling installation for BIT-2. The pumps will be shut down for maintenance one by one. This maintenance will be supervised by BIT engineers.