- 14-08-24Maintenance fire suppression BIT-2BCD
- 01-08-24Periodic maintenance fire detection and suppression system BIT-1
- 17-07-24Moving core network equipment in BIT-1
- 16-07-24Moving core network equipment in BIT-1
- 03-07-24Maintenance Microsoft SQL instances servers
- 02-07-24Fiber maintenance BIT-2 - Interxion Science Park (AMS9)
- 28-06-24Maintenance power generators BIT-2A
- 11-06-24Black building emergency power test BIT-2
- 11-06-24Maintenance management software virtualisation platform
- 04-06-24Black building emergency power test BIT-1
Periodic maintenance on all cooling pumps of BIT-2
22-01-2024 08:00:00
- 22-01-2024 17:30:00
Urgency: Planned
Affected services:
- Colocation in BIT-2A and BIT-2BC
Expected Impact: Slight increase in temperature
Customer intervention required: No
Reference number: 185048
Summary:
Periodic maintenance on the cooling pumps in BIT-2.
Details:
On Wednesday the 22th of January beween 8:00 hrs and 17.30 hrs, we will perform maintenance on all cooling pumps of the cooling installation for BIT-2. The pumps will be shut down for maintenance one by one. This maintenance will be supervised by BIT engineers.
Affected services:
- Colocation in BIT-2A and BIT-2BC
Expected Impact: Slight increase in temperature
Customer intervention required: No
Reference number: 185048
Summary:
Periodic maintenance on the cooling pumps in BIT-2.
Details:
On Wednesday the 22th of January beween 8:00 hrs and 17.30 hrs, we will perform maintenance on all cooling pumps of the cooling installation for BIT-2. The pumps will be shut down for maintenance one by one. This maintenance will be supervised by BIT engineers.