- 20-02-25Periodic maintenance generatorswitch and transformerswitch BIT-2A
- 19-02-25Maintenance building management system
- 12-02-25Cancelled: Maintenance core routers BIT-1 and BIT-2A
- 12-02-25Emergency maintenance DWDM equipment in Interxion AMS9
- 05-02-25Emergency maintenance MySQL 8 server
- 05-02-25Periodic maintenance fire detection and suppression system BIT-1
- 04-02-25Maintenance various services
- 13-01-25Periodic maintenance power generators BIT-2A
- 13-01-25Periodic maintenance power generators BIT-2BCD
- 13-01-25Periodic maintenance power generator BIT-1
Maintenance power generator BIT-1
21-03-2024 04:00:00
- 21-03-2024 07:00:00
Urgency: Planned
Affected services:
- Power supply in BIT-1
Expected impact: No emergency power available through power generator for 30 minutes
Customer intervention required: No
Reference number: 188370
Summary:
Maintenance will be done on the power generator.
Details:
During this maintenance, the power generator will be unavailable for 30 minutes. The UPS systems will remain operational. We strive to keep the maintenance window as short as possible.
This maintenance will be supervised by BIT engineers.
Affected services:
- Power supply in BIT-1
Expected impact: No emergency power available through power generator for 30 minutes
Customer intervention required: No
Reference number: 188370
Summary:
Maintenance will be done on the power generator.
Details:
During this maintenance, the power generator will be unavailable for 30 minutes. The UPS systems will remain operational. We strive to keep the maintenance window as short as possible.
This maintenance will be supervised by BIT engineers.