- 31-05-24Maintenance UPS sets BIT-2B
- 30-05-24Maintenance UPS sets BIT-2D
- 29-05-24Maintenance UPS-sets BIT-2C
- 28-05-24Maintenance UPS sets BIT-1
- 22-05-24Maintenance UPS sets BIT-2A
- 16-05-24Periodic maintenance powerinfra and transformers BIT-2
- 25-04-24Periodic maintenance cooling system BIT-2BCD
- 22-04-24Periodic maintenance cooling system BIT-2A
- 18-04-24Maintenance diesel tanks power generators BIT-2A
- 15-04-24Periodic maintenance cooling system BIT-1
Fiber maintenance BIT-1 - Telecity 2
12-05-2017 00:00:00
- 12-05-2017 09:00:00
Friday May 12th from 0.00h to 9.00h our supplier will perform scheduled maintenance on our fiber connection between BIT-1 in Ede and Telecity 2 in Amsterdam. During this maintenance the connection will be down for a several hours. Traffic will be rerouted via other paths, which can cause short disruptions in network connections. Customers using a wavelength between these locations provideb y BIT will notice disruption of their connections during the entire maintenance.