- 25-04-24Periodic maintenance cooling system BIT-2BCD
- 22-04-24Periodic maintenance cooling system BIT-2A
- 18-04-24Maintenance diesel tanks power generators BIT-2A
- 15-04-24Periodic maintenance cooling system BIT-1
- 11-04-24Maintenance computair units BIT-2A
- 09-04-24Maintenance computair units BIT-2C
- 08-04-24Maintenance computair units BIT-2B
- 05-04-24Firewall Maintenance
- 04-04-24Periodic maintenance fire detection and suppression systems BIT-2A and BIT-2BCD
- 04-04-24Maintenance diesel tanks power generators BIT-2A
Maintenance UPS-sets BIT-2C
09-10-2018 00:00:00
- 09-10-2018 07:00:00
Urgency: Planned
Affected services: Customers with equipment in BIT-2C
Expected Impact: None
Customer intervention required: No
Referencenumber: 153642
Summary:
On Tuesday the 9th of October between 00.00h and 07.00h our UPS-set supplier will be performing maintenance on our UPS-sets in BIT-2C.
Details:
During the maintenance our supplier will finish the work on placing the BACS management system on our batteries. This system will continuously monitor the state of all the individual batteries. This system will also equalize the voltage over the batteries.
Affected services: Customers with equipment in BIT-2C
Expected Impact: None
Customer intervention required: No
Referencenumber: 153642
Summary:
On Tuesday the 9th of October between 00.00h and 07.00h our UPS-set supplier will be performing maintenance on our UPS-sets in BIT-2C.
Details:
During the maintenance our supplier will finish the work on placing the BACS management system on our batteries. This system will continuously monitor the state of all the individual batteries. This system will also equalize the voltage over the batteries.