- 25-04-24Periodic maintenance cooling system BIT-2BCD
- 22-04-24Periodic maintenance cooling system BIT-2A
- 18-04-24Maintenance diesel tanks power generators BIT-2A
- 15-04-24Periodic maintenance cooling system BIT-1
- 11-04-24Maintenance computair units BIT-2A
- 09-04-24Maintenance computair units BIT-2C
- 08-04-24Maintenance computair units BIT-2B
- 05-04-24Firewall Maintenance
- 04-04-24Periodic maintenance fire detection and suppression systems BIT-2A and BIT-2BCD
- 04-04-24Maintenance diesel tanks power generators BIT-2A
Periodic maintenance powerinfra and transformers BIT-2
11-06-2019 05:00:00
- 11-06-2019 09:00:00
Urgency: Planned
Affected services: Power supply BIT-2ABCD
Expected impact: None
Customer intervention required: No
Reference number: 162687
Contact: +31 (0)318 648 688, support@bit.nl
Summary:
There will be periodic maintenance on the powerinfra and transformers for BIT-2.
Details:
Our supplier will perform maintenance on the power infra and transformers. BIT-2A, BIT-2BCD and our office, will be running on the redundant power generator sets.
We do not expect any disruption of the power supply. The transition to power provided by our generator sets will be supervised by BIT engineers. The maintenance will commence only if all redundant generator sets are up and running.
Affected services: Power supply BIT-2ABCD
Expected impact: None
Customer intervention required: No
Reference number: 162687
Contact: +31 (0)318 648 688, support@bit.nl
Summary:
There will be periodic maintenance on the powerinfra and transformers for BIT-2.
Details:
Our supplier will perform maintenance on the power infra and transformers. BIT-2A, BIT-2BCD and our office, will be running on the redundant power generator sets.
We do not expect any disruption of the power supply. The transition to power provided by our generator sets will be supervised by BIT engineers. The maintenance will commence only if all redundant generator sets are up and running.