- 25-04-24Periodic maintenance cooling system BIT-2BCD
- 22-04-24Periodic maintenance cooling system BIT-2A
- 18-04-24Maintenance diesel tanks power generators BIT-2A
- 15-04-24Periodic maintenance cooling system BIT-1
- 11-04-24Maintenance computair units BIT-2A
- 09-04-24Maintenance computair units BIT-2C
- 08-04-24Maintenance computair units BIT-2B
- 05-04-24Firewall Maintenance
- 04-04-24Periodic maintenance fire detection and suppression systems BIT-2A and BIT-2BCD
- 04-04-24Maintenance diesel tanks power generators BIT-2A
Periodic maintenance on all cooling pumps of BIT-2
21-06-2019 08:00:00
- 21-06-2019 17:30:00
Urgency: Planned
Affected services: None
Expected impact: Slight increase in temperature
Customer intervention required: No
Reference number: 162358
Contact: +31 (0)318 648 688, support@bit.nl
Summary:
Periodic maintenance on the cooling pumps in BIT-2.
Details:
On Thursday 20th and Friday 21st of June beween 8:00 hrs and 17.30 hrs, we will perform maintenance on the cooling pumps of the chillers of BIT-2. The pumps will be shutdown for maintenance one by one. This maintenance will be supervised by BIT engineers.
Affected services: None
Expected impact: Slight increase in temperature
Customer intervention required: No
Reference number: 162358
Contact: +31 (0)318 648 688, support@bit.nl
Summary:
Periodic maintenance on the cooling pumps in BIT-2.
Details:
On Thursday 20th and Friday 21st of June beween 8:00 hrs and 17.30 hrs, we will perform maintenance on the cooling pumps of the chillers of BIT-2. The pumps will be shutdown for maintenance one by one. This maintenance will be supervised by BIT engineers.