- 25-04-24Periodic maintenance cooling system BIT-2BCD
- 22-04-24Periodic maintenance cooling system BIT-2A
- 18-04-24Maintenance diesel tanks power generators BIT-2A
- 15-04-24Periodic maintenance cooling system BIT-1
- 11-04-24Maintenance computair units BIT-2A
- 09-04-24Maintenance computair units BIT-2C
- 08-04-24Maintenance computair units BIT-2B
- 05-04-24Firewall Maintenance
- 04-04-24Periodic maintenance fire detection and suppression systems BIT-2A and BIT-2BCD
- 04-04-24Maintenance diesel tanks power generators BIT-2A
Replacement of leaf-sw1.bit-2b
15-07-2021 00:00:00
- 15-07-2021 06:00:00
Urgency: Planned
Affected services:
- Network connections to switch "leaf-sw1.bit-2b"
Expected impact:
- Disruption of the network connection for approximately 30 minutes
Customer intervention required: No
Reference number: 175165
Summary:
Switch leaf-sw1.bit-2b logs memory errors and will be replaced by a spare switch.
Details:
The switch is logging memory errors. Since this is ECC (error correction code) memory there is no direct impact, faulty memory is not used. The switch vendor advises us to replace the switch. In this maintenance we will replace the switch with a spare switch, all physical connections will be moved.
We normally announce maintenance two weeks in advance. Following the advice of our switch vendor we will not wait for two weeks, but combine this maintenance with the maintenance on BIT switches in BIT-2A which was already announced.
You can find out to which switch you are connected by checking your invoice or network statistics in the customer portal.
Update placed at 15/07/2021, 4:00
The switch was replaced succesfully. All customer connections on the switch have been restored.
Affected services:
- Network connections to switch "leaf-sw1.bit-2b"
Expected impact:
- Disruption of the network connection for approximately 30 minutes
Customer intervention required: No
Reference number: 175165
Summary:
Switch leaf-sw1.bit-2b logs memory errors and will be replaced by a spare switch.
Details:
The switch is logging memory errors. Since this is ECC (error correction code) memory there is no direct impact, faulty memory is not used. The switch vendor advises us to replace the switch. In this maintenance we will replace the switch with a spare switch, all physical connections will be moved.
We normally announce maintenance two weeks in advance. Following the advice of our switch vendor we will not wait for two weeks, but combine this maintenance with the maintenance on BIT switches in BIT-2A which was already announced.
You can find out to which switch you are connected by checking your invoice or network statistics in the customer portal.
Update placed at 15/07/2021, 4:00
The switch was replaced succesfully. All customer connections on the switch have been restored.