- 06-07-22Maintenance on customer VLANs Ede-Amsterdam and mobile internet access
- 29-06-22Periodic maintenance power distribution BIT-2BCD
- 28-06-22Periodic maintenance power distribution BIT-2BCD
- 14-06-22Black building emergency power test BIT-2
- 07-06-22Black building emergency power test BIT-1
- 03-06-22Maintenance UPS-sets BIT-2B
- 02-06-22Maintenance UPS sets BIT-2D
- 31-05-22Maintenance UPS-sets BIT-2A
- 25-05-22Maintenance UPS-sets BIT-2C
- 23-05-22Maintenance UPS sets BIT-1
Maintenance transfer switch generator/grid BIT-2BCD
29-04-2022 05:30:00
- 29-04-2022 07:00:00
Urgency: Planned
Affected services:
- B-feed BIT-2B
- B-feed BIT-2C
- B-feed BIT-2D
Expected impact: None
Customer intervention required: No
Reference number: 179427
Summary:
Transfer switch maintenance.
Details:
For maintenance of the transfer switch, it will be necessary to remove it from the installation for a short period of time. If there is a power outage on the grid during the repair, this will cause an outage on the B-feed in BIT-2B, BIT-2C and BIT-2D. We recommend that you double-check that all of your equipment is connected to both feeds. Of course the B-feed has a UPS in place, so a brief interruption from the grid will not result in power outage.
This entire maintenance will be supervised by BIT engineers.
Affected services:
- B-feed BIT-2B
- B-feed BIT-2C
- B-feed BIT-2D
Expected impact: None
Customer intervention required: No
Reference number: 179427
Summary:
Transfer switch maintenance.
Details:
For maintenance of the transfer switch, it will be necessary to remove it from the installation for a short period of time. If there is a power outage on the grid during the repair, this will cause an outage on the B-feed in BIT-2B, BIT-2C and BIT-2D. We recommend that you double-check that all of your equipment is connected to both feeds. Of course the B-feed has a UPS in place, so a brief interruption from the grid will not result in power outage.
This entire maintenance will be supervised by BIT engineers.