- 31-05-24Maintenance UPS sets BIT-2B
- 30-05-24Maintenance UPS sets BIT-2D
- 29-05-24Maintenance UPS-sets BIT-2C
- 28-05-24Maintenance UPS sets BIT-1
- 22-05-24Maintenance UPS sets BIT-2A
- 16-05-24Periodic maintenance powerinfra and transformers BIT-2
- 25-04-24Periodic maintenance cooling system BIT-2BCD
- 22-04-24Periodic maintenance cooling system BIT-2A
- 18-04-24Maintenance diesel tanks power generators BIT-2A
- 15-04-24Periodic maintenance cooling system BIT-1
Maintenance power distribution BIT-2A
27-09-2022 00:00:00
- 28-09-2022 07:00:00
Urgency: Planned
Affected services: Power distribution BIT-2A
Expected impact: Interruption power distribution BIT-2A
Customer intervention required: No
Reference number: 174645
Summary:
Maintenance will be carried out on the power distribution of BIT-2A.
Details:
Maintenance will be carried out on the power distribution of BIT-2A. During this maintenance there will be the possibility of interruption on one of the two power feeds. There will always be one feed fully operational.
We strongly advice you to make sure all equipment is connected to both power feeds.
This entire maintenance will be supervised by BIT engineers.
Affected services: Power distribution BIT-2A
Expected impact: Interruption power distribution BIT-2A
Customer intervention required: No
Reference number: 174645
Summary:
Maintenance will be carried out on the power distribution of BIT-2A.
Details:
Maintenance will be carried out on the power distribution of BIT-2A. During this maintenance there will be the possibility of interruption on one of the two power feeds. There will always be one feed fully operational.
We strongly advice you to make sure all equipment is connected to both power feeds.
This entire maintenance will be supervised by BIT engineers.