- 25-04-24Periodic maintenance cooling system BIT-2BCD
- 22-04-24Periodic maintenance cooling system BIT-2A
- 18-04-24Maintenance diesel tanks power generators BIT-2A
- 15-04-24Periodic maintenance cooling system BIT-1
- 11-04-24Maintenance computair units BIT-2A
- 09-04-24Maintenance computair units BIT-2C
- 08-04-24Maintenance computair units BIT-2B
- 05-04-24Firewall Maintenance
- 04-04-24Periodic maintenance fire detection and suppression systems BIT-2A and BIT-2BCD
- 04-04-24Maintenance diesel tanks power generators BIT-2A
Black building emergency power test BIT-2
11-06-2019 05:00:00
- 11-06-2019 07:00:00
Urgency: Planned
Affected services: Customers with equipment in BIT-2ABCD
Expected impact: None
Customer intervention required: No
Reference number: 162686
Contact: +31 (0)318 648 688, support@bit.nl
Summary:
On Tuesday June 11th between 5:00 hrs and 7:00 hrs we will perform a black building emergency power test.
Details:
During this maintenance we will switch off our power supply for the entire location BIT-2 for 60 minutes to test our emergency power systems. During this test, engineers from BIT will be monitoring the situation on multiple locations and will, if the need should arise, intervene. We will perform a battery discharge test in the days leading up to the black building test. This discharge test will be performed on both feeds separately.
Affected services: Customers with equipment in BIT-2ABCD
Expected impact: None
Customer intervention required: No
Reference number: 162686
Contact: +31 (0)318 648 688, support@bit.nl
Summary:
On Tuesday June 11th between 5:00 hrs and 7:00 hrs we will perform a black building emergency power test.
Details:
During this maintenance we will switch off our power supply for the entire location BIT-2 for 60 minutes to test our emergency power systems. During this test, engineers from BIT will be monitoring the situation on multiple locations and will, if the need should arise, intervene. We will perform a battery discharge test in the days leading up to the black building test. This discharge test will be performed on both feeds separately.