- 25-04-24Periodic maintenance cooling system BIT-2BCD
- 22-04-24Periodic maintenance cooling system BIT-2A
- 18-04-24Maintenance diesel tanks power generators BIT-2A
- 15-04-24Periodic maintenance cooling system BIT-1
- 11-04-24Maintenance computair units BIT-2A
- 09-04-24Maintenance computair units BIT-2C
- 08-04-24Maintenance computair units BIT-2B
- 05-04-24Firewall Maintenance
- 04-04-24Periodic maintenance fire detection and suppression systems BIT-2A and BIT-2BCD
- 04-04-24Maintenance diesel tanks power generators BIT-2A
Maintenance drycooler BIT-2A
27-09-2021 07:00:00
- 08-10-2021 17:30:31
Urgency: Planned
Affected services:
- Equipment in BIT-2A
Expected impact: Slight increase or decrease in temperature
Customer intervention required: No
Reference number: 173895
Summary:
The drycooler of BIT-2A is being replaced.
Details:
The drycooler (responsible for free cooling of BIT-2A) is being replaced. Our three chillers will take over the cooling of BIT-2A. This may cause a slight increase or decrease in temperature in the room during the switch from drycooler to chillers.
The maintenance will take place every workday between 07:00 and 17:30 hrs
This maintenance will be supervised by BIT engineers, who will also monitor the temperature in the data center closely.
Affected services:
- Equipment in BIT-2A
Expected impact: Slight increase or decrease in temperature
Customer intervention required: No
Reference number: 173895
Summary:
The drycooler of BIT-2A is being replaced.
Details:
The drycooler (responsible for free cooling of BIT-2A) is being replaced. Our three chillers will take over the cooling of BIT-2A. This may cause a slight increase or decrease in temperature in the room during the switch from drycooler to chillers.
The maintenance will take place every workday between 07:00 and 17:30 hrs
This maintenance will be supervised by BIT engineers, who will also monitor the temperature in the data center closely.