- 30-12-22Wijziging stroomtarieven en portal updates
- 25-11-22BIT Friday
- 21-09-22BIT levert restwarmte aan Warmtebedrijf Ede
- 14-09-22Ruim helft organisaties kijkt naar duurzaamheid in keuze voor datacenter of cloudprovider
- 17-08-22Grand Prix Radio kiest voor betrouwbare hosting van radio-automatisering bij datacenter BIT
- 10-08-22Helft IT-beslissers gaat bij keuze voor nieuwe cloudleverancier voor grote naam
- 21-07-22Ruim een derde van IT-beslissers wil overstap maken naar Europees cloudplatform
- 30-06-22Eén op de vijf IT-beslissers heeft weinig vertrouwen in databescherming en privacy in de cloud
- 27-05-22Update RFO netwerk incident 17-04-2022
- 23-05-22Freedom of Information Coalition (FOIC) stapt naar de Europese rechter
Periodic maintenance cooling system BIT-2A
17-10-2022 08:00:00
- 21-10-2022 17:30:00
Urgency: Planned
Affected services:
- Colocation in BIT-2A
Expected impact: Slight increase in temperature
Customer intervention required: No
Reference number: 181739
Summary:
Periodic maintenance is performed on chillers and downflow units in BIT-2A.
Details:
The downflow units (responsible for blowing cold air in the data centers) will be shut down for maintenance one at a time. This may result in a slight temporary increase in temperature in specific parts of the data center. The chillers of BIT-2A will be shut down for maintenance one at a time as well. The remaining two chillers have sufficient capacity to cool the data center.
The maintenance will take place every workday between 08:00 and 17:30 hrs
This maintenance will be supervised by BIT engineers who will monitor the temperature in the data center closely.
Affected services:
- Colocation in BIT-2A
Expected impact: Slight increase in temperature
Customer intervention required: No
Reference number: 181739
Summary:
Periodic maintenance is performed on chillers and downflow units in BIT-2A.
Details:
The downflow units (responsible for blowing cold air in the data centers) will be shut down for maintenance one at a time. This may result in a slight temporary increase in temperature in specific parts of the data center. The chillers of BIT-2A will be shut down for maintenance one at a time as well. The remaining two chillers have sufficient capacity to cool the data center.
The maintenance will take place every workday between 08:00 and 17:30 hrs
This maintenance will be supervised by BIT engineers who will monitor the temperature in the data center closely.